Short Lead Time for House Electric Meter - Three Phase TOU Meter LY-MT300 – linyang

Product Detail

Product Tags

Related Video

Feedback (2)

Our aim is usually to give superior quality items at aggressive rates, and top-notch company to clients around the earth. We have been ISO9001, CE, and GS certified and strictly adhere to their good quality specifications for PV Projects Construction , Neutral line connected relay , Electricity Consumption Meter , We, with fantastic passion and faithfulness, are willing to offer you with best services and striding forward with you to make a bright foreseeable future.
China Short Lead Time for House Electric Meter - Three Phase TOU Meter LY-MT300 – linyang factory and suppliers | Linyang Detail:

Key Specifications

Electrical Parameter
● Connection Type: 3P4W
● Nominal Voltage: 3×110/190V, 3×120/208V, 3×220/380V, 3×230/400V, 3×240/415V (±30%)
● Nominal Current: 5A
● Frequency: 50/60 Hz ± 1%
● Dimension: 265 x 170 x 75 LWH (mm)

Communication
● Local Communication: Optical Port, RS485

Key Functions
● Tariffs: 4
● Anti-Tampering: Magnetic Field, Bypass(optional), Meter/Terminal Cover open, Reverse Energy, Missing Phase or/and Neutral
● Billing Periods: 12 months
● Event Log
● Load Profile
● Measuring Values: kWh, kvarh
● Instantaneous Parameters: kW, kvar V, I, kva, F, PF

LY-MT300-11
LY-MT300-22

Key Features

● Bi-directional measurement
● 4-quadrant measurement
● Neutral measurement
● Integrated type or split type optional
● Local Communication: Optical Port, RS485
● Real Time Clock
● TOU
● Demand monitoring
● Anti-Tampering: Magnetic Field, Bypass (optional), Meter/Terminal Cover open, Reverse Energy, Phase and Neutral current unbalance

11-02

TOU

3331

Hermetically or Ultrasonic Sealing

13-1

DEMAND MONITORING

10011

12 BILLING PERIODS

11-04

NEUTRAL MEASUREMENT

10012

EVENT AND ALARM

11-05

RS 485 PORT

10013

LOAD PROFILE

Protocol & Standards

● IEC 62052-11
● IEC 62053-21/23
● IEC 62056-21

Certificates

● IEC
● DLMS
● CNAS
● MID

LY-MT300-33
12-03
D9
11-06
300-6


Product detail pictures:

China Short Lead Time for House Electric Meter -
 Three Phase TOU Meter LY-MT300 – linyang factory and suppliers | Linyang detail pictures

China Short Lead Time for House Electric Meter -
 Three Phase TOU Meter LY-MT300 – linyang factory and suppliers | Linyang detail pictures

China Short Lead Time for House Electric Meter -
 Three Phase TOU Meter LY-MT300 – linyang factory and suppliers | Linyang detail pictures


Related Product Guide:

We've been committed to offering easy,time-saving and money-saving one-stop purchasing service of consumer for China Short Lead Time for House Electric Meter - Three Phase TOU Meter LY-MT300 – linyang factory and suppliers | Linyang, The product will supply to all over the world, such as: Angola , Iceland , United States , We integrate design, manufacture and export together with more than 100 skillful workers, strict quality controlling system and experienced technology.We keep long term business relationships with wholesaler and distributors form more than 50 countries, such as USA, UK, Canada, Europe and Africa etc.
  • On this website, product categories is clear and rich, I can find the product I want very quickly and easily, this is really very good!
    5 Stars By Dale from Montpellier - 2018.06.05 13:10
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Marcia from Mumbai - 2018.11.22 12:28