Short Lead Time for House Electric Meter - Three Phase TOU Meter LY-MT300 – linyang

Product Detail

Product Tags

Related Video

Feedback (2)

We normally think and practice corresponding on the change of circumstance, and grow up. We aim at the achievement of a richer mind and body and also the living for Solar Module Installation , Led Linear Lamp , PV Module String , Should further information be required, please contact us at any time!
China Short Lead Time for House Electric Meter - Three Phase TOU Meter LY-MT300 – linyang factory and suppliers | Linyang Detail:

Key Specifications

Electrical Parameter
● Connection Type: 3P4W
● Nominal Voltage: 3×110/190V, 3×120/208V, 3×220/380V, 3×230/400V, 3×240/415V (±30%)
● Nominal Current: 5A
● Frequency: 50/60 Hz ± 1%
● Dimension: 265 x 170 x 75 LWH (mm)

Communication
● Local Communication: Optical Port, RS485

Key Functions
● Tariffs: 4
● Anti-Tampering: Magnetic Field, Bypass(optional), Meter/Terminal Cover open, Reverse Energy, Missing Phase or/and Neutral
● Billing Periods: 12 months
● Event Log
● Load Profile
● Measuring Values: kWh, kvarh
● Instantaneous Parameters: kW, kvar V, I, kva, F, PF

LY-MT300-11
LY-MT300-22

Key Features

● Bi-directional measurement
● 4-quadrant measurement
● Neutral measurement
● Integrated type or split type optional
● Local Communication: Optical Port, RS485
● Real Time Clock
● TOU
● Demand monitoring
● Anti-Tampering: Magnetic Field, Bypass (optional), Meter/Terminal Cover open, Reverse Energy, Phase and Neutral current unbalance

11-02

TOU

3331

Hermetically or Ultrasonic Sealing

13-1

DEMAND MONITORING

10011

12 BILLING PERIODS

11-04

NEUTRAL MEASUREMENT

10012

EVENT AND ALARM

11-05

RS 485 PORT

10013

LOAD PROFILE

Protocol & Standards

● IEC 62052-11
● IEC 62053-21/23
● IEC 62056-21

Certificates

● IEC
● DLMS
● CNAS
● MID

LY-MT300-33
12-03
D9
11-06
300-6


Product detail pictures:

China Short Lead Time for House Electric Meter -
 Three Phase TOU Meter LY-MT300 – linyang factory and suppliers | Linyang detail pictures

China Short Lead Time for House Electric Meter -
 Three Phase TOU Meter LY-MT300 – linyang factory and suppliers | Linyang detail pictures

China Short Lead Time for House Electric Meter -
 Three Phase TOU Meter LY-MT300 – linyang factory and suppliers | Linyang detail pictures


Related Product Guide:

We have been also specializing in improving the things administration and QC system to ensure that we could preserve terrific gain within the fiercely-competitive company for China Short Lead Time for House Electric Meter - Three Phase TOU Meter LY-MT300 – linyang factory and suppliers | Linyang, The product will supply to all over the world, such as: Mozambique , Angola , Haiti , Our Company policy is "quality first, to be better and stronger, sustainable development" . Our pursuit goals is "for society, customers, employees, partners and enterprises to seek reasonable benefit". We aspirate to do cooperate with all different the auto parts manufacturers, repair shop, auto peer , then create a beautiful future! Thank you for taking time to browse our website and we would welcome any suggestions you may have that can help us to improve our site.
  • Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Pamela from Bogota - 2017.06.16 18:23
    Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
    5 Stars By Lilith from Greece - 2018.06.09 12:42