Short Lead Time for House Electric Meter - Smart Single Phase Meter LY-SM 150Postpaid – linyang

Product Detail

Product Tags

Related Video

Feedback (2)

We emphasize progress and introduce new merchandise into the market each and every year for Led Ceiling Down Lamp , PV Panels , Reverse Energy , We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
China Short Lead Time for House Electric Meter - Smart Single Phase Meter LY-SM 150Postpaid – linyang factory and suppliers | Linyang Detail:

Key Specifications

Electrical Parameter

● Connection Type: 1P2W

● Nominal Voltage: 220V,230V, 240V (±30%)

● Nominal Current: 5A, 10A

● Frequency: 50/60 Hz ± 1%

● Dimension: 238 x 137 x 78.5 LWH (mm)

Communication

● Local Communication: Optical Port, RS485, M-BUS

● Remote Communication: PLC/RF/GPRS/2G/3G/4G/NB-IoT

Key Functions

● Tariffs: 4

● Anti-Tampering: Magnetic Field, Bypass, Meter/Terminal Cover open, Reverse Energy, Missing Phase or/and Neutral

● Billing Periods: 12 months

● Event Log

● Load Control: Time & Power Thresholds

● Load Profile

● Measuring Values: kWh, kvarh

● Instantaneous Parameters: kW, kvar, V, I, kva, F, PF

● Multi-Utility: Gas/Water/Heat

SM150-11
SM150-22

Key Features

● Bi-directional measurement

● 4-quadrant measurement

● Neutral measurement

● Neutral line missing measurement

● Internal Relay

● Dual-disconnect relay

● Neutral line connected relay

● Internal or replaceable battery as optional

● Power quality management

● Demand monitoring

● Remote upgrade

● Real Time Clock

● TOU

● Plug-and-play communication module with PLC/RF/GPRS/2G/3G/4G/NB-IoT

● Anti-Tampering: Magnetic Field, Bypass, Meter/Terminal Cover open, Reverse Energy, Missing Phase or/and Neutral

150-02

AMI

300-1

REMOTE UPGRADING

11-04

NEUTRAL MEASUREMENT

PQ MONITORING

PQ MONITORING

150-06

LOAD CONTROL

150-08

MODULAR COMMUNICATION

150-05

INTEROPERABILITY

150-03

ANTI-TAMPER

Protocol & Standards

● IEC 62052-11

● IEC 62053-21/23

● EN 50470-1/3

● IEC 62056

Certificates

● IEC

● DLMS

● IDIS

● MID

● PRIME

● SABS

● SGS

● G3-PLC

SM150-33
12-03
D9
300-6
3501
1221
D10
1231
300-7


Product detail pictures:

China Short Lead Time for House Electric Meter -
 Smart Single Phase Meter LY-SM 150Postpaid – linyang factory and suppliers | Linyang detail pictures

China Short Lead Time for House Electric Meter -
 Smart Single Phase Meter LY-SM 150Postpaid – linyang factory and suppliers | Linyang detail pictures

China Short Lead Time for House Electric Meter -
 Smart Single Phase Meter LY-SM 150Postpaid – linyang factory and suppliers | Linyang detail pictures


Related Product Guide:

We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate in our success for China Short Lead Time for House Electric Meter - Smart Single Phase Meter LY-SM 150Postpaid – linyang factory and suppliers | Linyang, The product will supply to all over the world, such as: Atlanta , Estonia , Sacramento , because of our company has been persisting in the management idea of "Survival by Quality, Development by Service, Benefit by Reputation" . We fully realize the good credit standing, the high quality products, the reasonable price and the professional services are the reason that the customers choose us to be their long-term business partner.
  • Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Harriet from Uzbekistan - 2018.08.12 12:27
    A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Quintina from France - 2018.09.08 17:09