Short Lead Time for House Electric Meter - DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang

Product Detail

Product Tags

Related Video

Feedback (2)

Our rewards are lower costs,dynamic profits team,specialised QC,potent factories,high-quality services for PV Module Cleaning System , Led Linear Lamp , AMI Grid , We warmly welcome friends from all walks of existence to cooperate with us.
China Short Lead Time for House Electric Meter - DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang factory and suppliers | Linyang Detail:

Key Specifications

Electrical Parameter

● Connection Type: 1P2W

● Nominal Voltage: 110V, 120V, 220V, 230V, 240V (±30%)

● Nominal Current: 5A, 10A

● Frequency: 50/60 Hz ± 1%

● Dimension: 168 x 115 x 54 LWH (mm)

Communication

● Local Communication: Optical Port, RS485

● CIU Communication: PLC/RF/M-BUS

Key Functions

● Tariffs: 8

● Anti-Tampering: Magnetic Field, Meter/Terminal Cover open, Reverse Energy

● Billing Periods: 12 months

● Credit management

● Event Log

● Load Control: Tamper, Power Thresholds, Over/Under Voltage (Configurable)

● Measuring Values: kWh, kvarh

● Instantaneous Parameters: kW, kvar V, I, kva, F, PF

●  Power Quality: Energy/Currency via Keypad

 

KP12-C3
KP12-C22

Key Features

● Internal relay

● Neutral measurement

● Bi-directional measurement

● 4-quadrant measurement

● Prepaid mode

● Integrated type or split type optional

● Load Control

● Demand monitoring

● Real Time Clock

● TOU

● Local Communication: Optical Port, RS485, M-BUS (optional)

● Remote Communication: PLC/RF/M-BUS

● Anti-Tampering: Magnetic Field, Meter/Terminal Cover open, Reverse Energy

● STS compliant

11-02

TOU

150-04

STS COMPLIAN

150-01

POSTPAID/PREPAID

150-06

LOAD CONTROL

11-04

NEUTRAL MEASUREMENT

150-03

ANTI-TAMPER

Protocol & Standards

● IEC 62052-11

● IEC 62053-21/23

● IEC 62056-21/46/47(DLMS)

● IEC 62055-31 etc

Certificates

● IEC

● DLMS

● STS

● IDIS

● MID

● SABS

● G3-PLC

● SGS

KP12-C11
12-03
D9
D10
11-06
300-6
1221
300-7
1231


Product detail pictures:

China Short Lead Time for House Electric Meter -
 DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang factory and suppliers | Linyang detail pictures

China Short Lead Time for House Electric Meter -
 DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang factory and suppliers | Linyang detail pictures

China Short Lead Time for House Electric Meter -
 DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang factory and suppliers | Linyang detail pictures


Related Product Guide:

Our advantages are lower prices,dynamic sales team,specialized QC,strong factories,high quality products and services for China Short Lead Time for House Electric Meter - DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang factory and suppliers | Linyang, The product will supply to all over the world, such as: Buenos Aires , Bhutan , Mauritius , because of our company has been persisting in the management idea of "Survival by Quality, Development by Service, Benefit by Reputation" . We fully realize the good credit standing, the high quality products, the reasonable price and the professional services are the reason that the customers choose us to be their long-term business partner.
  • Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
    5 Stars By Lynn from French - 2018.02.12 14:52
    This company conforms to the market requirement and joins in the market competition by its high quality product, this is an enterprise that have Chinese spirit.
    5 Stars By Maria from Kuwait - 2018.09.29 17:23