Short Lead Time for House Electric Meter - DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang

Product Detail

Product Tags

Related Video

Feedback (2)

Our merchandise are commonly recognized and reliable by customers and can meet constantly developing economic and social desires for AMI Grid , AMR Energy Meter , Vertical Solar Panels , Please don't hesitate to contact us if you are interested in our products. We firmly believe our products will make you satisfied.
China Short Lead Time for House Electric Meter - DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang factory and suppliers | Linyang Detail:

Key Specifications

Electrical Parameter

● Connection Type: 1P2W

● Nominal Voltage: 110V, 120V, 220V, 230V, 240V (±30%)

● Nominal Current: 5A, 10A

● Frequency: 50/60 Hz ± 1%

● Dimension: 168 x 115 x 54 LWH (mm)

Communication

● Local Communication: Optical Port, RS485

● CIU Communication: PLC/RF/M-BUS

Key Functions

● Tariffs: 8

● Anti-Tampering: Magnetic Field, Meter/Terminal Cover open, Reverse Energy

● Billing Periods: 12 months

● Credit management

● Event Log

● Load Control: Tamper, Power Thresholds, Over/Under Voltage (Configurable)

● Measuring Values: kWh, kvarh

● Instantaneous Parameters: kW, kvar V, I, kva, F, PF

●  Power Quality: Energy/Currency via Keypad

 

KP12-C3
KP12-C22

Key Features

● Internal relay

● Neutral measurement

● Bi-directional measurement

● 4-quadrant measurement

● Prepaid mode

● Integrated type or split type optional

● Load Control

● Demand monitoring

● Real Time Clock

● TOU

● Local Communication: Optical Port, RS485, M-BUS (optional)

● Remote Communication: PLC/RF/M-BUS

● Anti-Tampering: Magnetic Field, Meter/Terminal Cover open, Reverse Energy

● STS compliant

11-02

TOU

150-04

STS COMPLIAN

150-01

POSTPAID/PREPAID

150-06

LOAD CONTROL

11-04

NEUTRAL MEASUREMENT

150-03

ANTI-TAMPER

Protocol & Standards

● IEC 62052-11

● IEC 62053-21/23

● IEC 62056-21/46/47(DLMS)

● IEC 62055-31 etc

Certificates

● IEC

● DLMS

● STS

● IDIS

● MID

● SABS

● G3-PLC

● SGS

KP12-C11
12-03
D9
D10
11-06
300-6
1221
300-7
1231


Product detail pictures:

China Short Lead Time for House Electric Meter -
 DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang factory and suppliers | Linyang detail pictures

China Short Lead Time for House Electric Meter -
 DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang factory and suppliers | Linyang detail pictures

China Short Lead Time for House Electric Meter -
 DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang factory and suppliers | Linyang detail pictures


Related Product Guide:

We now have several exceptional workers customers good at marketing, QC, and working with types of troublesome trouble during the creation system for China Short Lead Time for House Electric Meter - DIN-Rail Single Phase Prepaid Meter LY-KP12-C – linyang factory and suppliers | Linyang, The product will supply to all over the world, such as: Iraq , Sydney , Greece , We welcome customers from all over the world come to discuss business. We supply high quality solutions, reasonable prices and good services. We hope to sincerely build business relationships with customers from at home and abroad, jointly striving for a resplendent tomorrow.
  • The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Jeff Wolfe from Gambia - 2017.08.18 11:04
    Wide range, good quality, reasonable prices and good service, advanced equipment, excellent talents and continuously strengthened technology forces,a nice business partner.
    5 Stars By Dee Lopez from Italy - 2017.05.02 11:33