Wuwei 100MW/200MWh energy storage project was successfully connected to the grid

  • January 01, 2025


On January 1, the 100MW/200MWh energy storage project in Wuwei, Anhui, developed by Global Logistic Properties Ltd.(GLP), was successfully connected to the grid. 


The project utilizes Linyang Energy Storage's next-generation Power Atlantic® Grid Scale BESS Solution, featuring innovative technologies such as 3S fusion control, lifecycle health prediction, fault forecasting, and multi-unit coordination. These advancements enhance system longevity, safety, and availability, ensuring stable and efficient performance. The energy storage system strengthens grid flexibility and boosts renewable energy integration, supporting the high-quality development of clean energy.


Upon grid connection, the project will significantly enhance renewable energy absorption in Anhui, support Wuwei’s power supply needs, improve peak-shaving, optimize resource allocation, and reduce dependence on traditional energy sources. 


Linyang Energy Storage is committed to providing intelligent, high-performance storage solutions across various applications, including grid-side, renewable integration, commercial storage, and solar-storage microgrids. With continuous innovation in 3S integrated energy storage systems(BMS+PCS+EMS), we offer global partners reliable solutions that deliver safety, efficiency, longevity, and scalability.


1736221098776.jpg