Leveraging the abundant sunlight and vast usable area of barren hills, Linyang Renewable Energy has strategically built photovoltaic power stations on these terrains. The projects utilize flexible mounting systems with low site preparation requirements and high pre-assembly efficiency, effectively overcoming challenges such as uneven terrain and dense vegetation.

aa08.jpg

Advantages

  • icon_09.svg

    High-efficiency System
    Supplies leading high-efficiency solar cells, photovoltaic modules, and system solutions
    Achieves an additional 30% power gain (bifacial modules)
    Baesd on the advantage of Linyang's "N-type integrated industry chain"

  • icon_08.svg

    Excellent Management
    Focuses closely on four key elements: quality, safety, schedule, and cost
    Professional project management tools achieve full life cycle control of the project
    Widely promotes model projects and key milestone control

  • icon_14.svg

    Innovative Design
    Reduces project engineering costs from the source, with a design process that covers the entire life cycle of the project
    The designed construction exceeds 10GW
    Unique design covers various types of photovoltaic projects internationally

  • icon_07.svg

    Intelligent O&M
    Over 800 professional operation and maintenance team members
    The scale of renewable energy power plant operations and maintenance reaches 18GW
    Supported by the "Easy Solar" intelligent photovoltaic cloud platform

Project Cases

  • 案例1.jpg
    • Baoding, Hebei, China

    • December, 2021

    200MW

    200MW/Hebei Shunping Grid-Parity PV Power Station

  • 案例2_01.jpg
    • Suzhou, Anhui, China

    • December, 2015

    40MW

    40MW/Anhui Suzhou Lingbi Mountain PV Power Station

  • 4.jpg
    • Suzhou, Shandong, China

    • December, 2015

    20MW

    20MW/Anhui Xiaoxian Baitu Mountain PV Power Station

  • 案例4_01.jpg
    • Hohhot, Inner Mongolia, China

    • January, 2015

    135MW

    135MW/Inner Mongolia Tuoketuo County Desert Reclamation PV Power Station